
Henry Farm is mostly townhouses, and every one comes with a condo corporation
Henry Farm is the wedge around Sheppard and Don Mills, hemmed in by the 401 and the 404, with Fairview Mall and the Don Mills subway station at its centre. Much of it was laid out in the late 1960s and 1970s as condominium townhouse complexes, with a smaller number of detached houses and newer towers near the mall. That makes the renovation work here unusual for a suburb. A townhouse owner owns the inside of the unit, but the corporation controls the exterior, the shared services and often the rules for any work done inside. Before we price anything, we read the declaration and the alteration rules. The units themselves are tall and narrow, usually three or four levels with a ground-floor family room, a kitchen and living room above, and bedrooms on top. Owners want the stairs redone, the kitchen and bathrooms updated and one floor finish carried through the whole unit.
Price ranges: North York · cost guide
Proof of work
Recent projects in North York, near Henry Farm
We have not yet published a project in Henry Farm itself. These are the 2 projects we completed in North York, the city Henry Farm sits in — the same crew, the same drive. View all projects.
Henry Farm housing, block by block
Condo townhouse complexes
Rows of 1970s townhouses around shared lanes and green space. Original oak kitchens, narrow stairs with carpet, and bathrooms with the first tile they ever had. The corporation approves the work; we prepare the drawings and schedule it asks for.
Stacked and back-to-back units
Some complexes have units with shared walls on more than two sides. Sound between neighbours matters here, so we use acoustic underlay under hard flooring and insulate interior walls we open.
Detached houses
A smaller number of 1960s and 1970s detached homes, mostly two-storeys and back-splits. These are renovated like the houses in Parkwoods or Don Mills: kitchen, bathrooms and lower level, with no corporation in the way.
Fairview Mall towers
Condo towers close to the mall and the subway. Suite kitchens and bathrooms for owners and investors, booked through management with elevator pads, loading dock times and the building’s quiet hours.
Highway edges
Units backing onto the 401 or 404. Owners often ask us to put bedrooms or a home office on the quieter side and to use solid-core doors and insulated partition walls inside.
A townhouse refit from the stairs up
Most Henry Farm units we see need the same three things: stairs, kitchen and floors. We submit the alteration request to the corporation first, with a scope and schedule. Once approved, we pull the carpet from every level and the original kitchen. The stairs get new treads and risers over the existing stringers, plus a new railing. Floors go down continuously, with acoustic underlay where the rules ask for it. The kitchen is rebuilt in the same footprint or opened toward the living room if the wall is not structural, which is common in these units. Last, the main bathroom. The usual surprise is a shared plumbing line in our wall that is the corporation’s to repair. Eight to ten weeks.
People also ask
Home Renovation questions - Henry Farm
What drives the cost of a home renovation in Henry Farm?
Do I need my condo corporation’s permission to renovate my Henry Farm townhouse?
Can you rebuild the stairs in a three-level townhouse?
Let’s talk
Contact Osoba Renos & Design
Planning a home renovation in Henry Farm? Book a free in-home estimate.
- Phone647-562-4275
- E-mailosobarenos@gmail.com
- Service areaMississauga & GTA
