Why a whole-home renovation is quoted per square foot
Full-home renovations are quoted at $80–$150/sq. ft. because home size varies far more than scope does — a 1,500 sq ft bungalow and a 3,000 sq ft two-storey with the same finish level are different projects. Individual rooms inside that: kitchens $25,000–$50,000, bathrooms $12,000–$22,000. Structural and second-suite work is priced as an add-on.
A flat package price for “a whole home” is a number that has to be wrong for someone. A 1,500 sq ft bungalow and a 3,000 sq ft two-storey at the same finish level are twice the work, so we quote the rate and measure the house. The variable that surprises people is not size though — it is how much of the existing structure stays.
Every figure on this page is the range we quote against across Toronto and the GTA. See renovation costs across every service for the full picture, or full home renovation for what the work involves.
Cost by scope
Ranges we quote against. Final price is fixed after an on-site measure.
| Scope | Cost | On site | What it includes |
|---|---|---|---|
| Kitchen renovation | $25,000–$50,000 | 3–5 weeks | Custom cabinetry, quartz counters, tile backsplash, appliances, lighting, electrical updates. Above $50,000 is beyond our typical scope. |
| Bathroom renovation | $12,000–$22,000 | 2–4 weeks | Strip to studs, waterproofing, tile, vanity, fixtures, glass, lighting. |
| Whole-home renovation | $80–$150/sq. ft. | 8–14 weeks | Every room — kitchen, bathrooms, flooring, doors, trim, lighting, paint. Priced per sq ft at estimate; temporary relocation usually recommended. |
Room-by-room figures for the pieces: kitchen renovation cost, bathroom renovation cost, and basement renovation cost.
What moves a whole-home number
How much comes out
A cosmetic refresh that keeps kitchens, bathrooms and layouts is a different job from a gut to the studs. The demolition itself is cheap; what it exposes is not, and in a house built before 1970 something usually needs bringing up to current code once it is open.
Structural changes
Opening a load-bearing wall means an engineered LVL or steel beam, stamped drawings, a permit, and floor patching across the new opening. Budget $15,000–$45,000 as an add-on rather than assuming it is inside the rate.
Electrical and plumbing age
Knob-and-tube, cloth-sheathed wiring, or galvanised supply lines found behind a wall are not optional to replace once discovered. Older Etobicoke and North York houses carry this risk more than post-1980 stock.
Kitchen and bathroom count
These two rooms carry most of the finish cost in any house. Three bathrooms instead of one changes the total far more than an extra bedroom does.
Second-suite conversion
Egress windows, fire separation, a separate entry and a secondary kitchen. Priced as an add-on of $30,000–$70,000 because it is a code exercise as much as a construction one.
Living there or not
We recommend relocating for a whole-home gut. Phasing a project around an occupied house is possible and it lengthens the schedule, which costs money in a way that is easy to miss when comparing quotes.
Recent work
Whole Homes We Have Rebuilt
Make the Right Choice
Why homeowners chooseOsoba Renos Osoba Renos & Design
Home Remodeling Contractor in Toronto & GTA — clear pricing, in-house trades, and a guaranteed timeline.
People also ask
Full Home Renovation Cost questions - Toronto & GTA
How much does a full home renovation cost in Toronto?
Why not quote a flat price for a whole house?
How long does a full home renovation take?
What is the most expensive surprise in an older house?
Can I renovate in phases to spread the cost?
Let’s talk
Contact Osoba Renos & Design
Tell us your scope and we will come back with an itemised, fixed-price proposal after an on-site measure.
- Phone647-562-4275
- E-mailosobarenos@gmail.com
- Service areaMississauga & GTA