Kitchen Renovation Service

Kitchen Renovationin Toronto

Midtown · The Beaches · High Park · North York · Etobicoke

  • 3–5 week timelines
  • 5-yr warranty
  • Free estimate
See projects

House kitchens and condo kitchens are two different jobs

In a Toronto house the constraint is usually the building itself — old wiring, unlevel floors, and a wall someone wants opened. In a condo the constraint is the drain stack and the building rules, which decide where the sink can go before design starts. We quote the two differently. See kitchen renovation cost by scope tier, our kitchen renovation service across the GTA, or read open-concept vs traditional layout before deciding to remove a wall.

Toronto kitchen renovation cost & timeline (2026)

Four scope tiers, priced for a house. Add roughly 10–20% and one to two weeks for a downtown condo.

Scope tierCost rangeTimelineTypical inclusions
Cabinet & counter refresh$18,000–$28,0002–3 weeksNew cabinetry in the existing footprint, quartz counters, backsplash, sink and faucet, under-cabinet lighting, paint. Nothing moves, so no permit.
Full rebuild, same footprint$25,000–$40,0003–4 weeksStrip to studs, new cabinetry and counters, tile or slab backsplash, flooring, pot lights, dedicated circuits, ducted range hood, appliance install.
Full rebuild + layout change$35,000–$50,0004–5 weeksEverything above plus an island added or moved and the sink or dishwasher relocated — new plumbing rough-in, electrical, permit, and inspections.
Add open-concept wall removal+$15,000–$35,000+1–3 weeksLoad-bearing wall opened with an engineered LVL or steel beam, stamped engineer drawings, permit, and floor patching across the new opening.

Toronto neighbourhoods we work in

Housing stock changes what a kitchen renovation actually involves. Here is what we run into by area.

  • Kitchen renovation in Downtown & Midtown condos

    Kitchens in older towers usually cannot move the sink — the drain stack is fixed and the concrete slab cannot be cored. Layout gains come from removing a bulkhead, going full-height with the uppers, and swapping a peninsula for a proper island where the floor plan allows. Expect condo board approval, elevator booking, and a restricted 8am–5pm work window.

  • Kitchen renovation in The Beaches & Leslieville

    Narrow semis and detached homes from the 1910s–1930s. Kitchens are small and often sit at the back of the house behind a wall we get asked to open. Knob-and-tube wiring and 60-amp service still turn up, and both need to be dealt with before new circuits go in.

  • Kitchen renovation in High Park & Roncesvalles

    Edwardian and interwar houses with original kitchen footprints, back staircases, and pantries. Reworking the pantry into cabinetry or a coffee station is the most common ask. Floors are rarely level, so cabinet shimming and a self-levelling underlayment are usually in the scope.

  • Kitchen renovation in North York & Willowdale

    Post-war bungalows and 1960s–1980s detached homes with closed-off kitchens. The classic scope is removing the kitchen-to-dining wall with an engineered LVL beam, then building one continuous run with an island. Newer plumbing means fewer demo surprises than downtown.

  • Kitchen renovation in Etobicoke & Royal York

    Detached homes on wide lots, many with side-door kitchens and 1980s builder cabinetry. Full rebuilds with a relocated sink and dishwasher are typical. Our Royal York Gardens project above is a full gut in this pocket.

  • Kitchen renovation in Scarborough & East York

    Bungalows and semis where the kitchen renovation is often paired with a basement suite. Where a second kitchen is going in downstairs, both kitchens get permitted and inspected together — cheaper and faster than two separate applications.

Make the Right Choice

Why homeowners chooseOsoba Renos

№1 Home Remodeling Contractor in Toronto & GTA — clear pricing, in-house trades, and a guaranteed timeline.

Clear Pricing

Full transparency. After your free estimate we share a detailed proposal based on precise measurements — no hidden costs, no last-minute surprises.

5-Year Warranty

Our quality commitment, in writing. For up to 5 years after we deliver your project, our workmanship is covered — no exceptions.

In-House Trades

An experienced full-time crew — not a rotating cast of subs. Same faces, consistent quality, and a stress-free site from day one.

Dedicated Project Manager

One point of contact who runs the whole project on your behalf and resolves anything that comes up — quickly, without you chasing.

Guaranteed Timeline

A structured schedule with clear milestones, planned around every phase — so your project finishes on the date we set together.

What's included

Kitchen Renovation Scope

  • Custom Cabinetry

    Cabinets built to your layout — full-height uppers, deep drawers, pull-outs, and soft-close hardware throughout.

  • Quartz & Porcelain Countertops

    Templated and installed by our fabricator, with undermount sink cut-outs and waterfall or mitred edges.

  • Islands & Breakfast Bars

    Islands with seating, hidden storage, and — where the plumbing allows — a relocated sink or prep zone.

  • Tile & Slab Backsplashes

    Full-height slab, large-format porcelain, or classic tile, cut around outlets and under-cabinet lighting.

  • Electrical & Lighting Updates

    Pot lights, under-cabinet strips, pendants over the island, and the dedicated circuits code now requires.

  • Plumbing Relocations

    Moving the sink or dishwasher when the layout calls for it, with permits pulled and rough-ins inspected.

  • Appliance Integration

    Panelled fridge and dishwasher fronts, built-in wall ovens, and proper make-up air for high-CFM hoods.

  • Range Hoods & Ventilation

    Ducted hoods vented to the exterior — not recirculating — sized to the range beneath them.

  • Flooring

    Engineered hardwood, large-format porcelain, or luxury vinyl plank, levelled and transitioned to adjacent rooms.

  • Open-Concept Wall Removal

    Load-bearing walls opened with an engineered LVL or steel beam, drawings stamped and permitted.

  • Pantry & Storage Millwork

    Walk-in or cabinet pantries, coffee stations, and banquette seating built into the cabinetry run.

  • Paint & Finishing

    Trim, crown, baseboards, and a full paint finish so the kitchen reads as part of the rest of the floor.

Questions answered

Kitchen Renovation FAQ — Toronto

How much does a kitchen renovation cost in Toronto?
Most Toronto kitchen renovations fall between $25,000–$50,000. A cabinet-and-counter refresh in the existing footprint starts around $18,000. Downtown condo kitchens usually cost 10–20% more than the same scope in a house, because of elevator booking, restricted work hours, and material handling. Projects above $50,000 are typically beyond our usual scope.
How long does a kitchen renovation take in Toronto?
Three to five weeks on site for a house. Add one to two weeks for a downtown condo — the 8am–5pm work window and single service elevator slow down every delivery and every debris run. Custom cabinetry runs 4–8 weeks from sign-off, so the real calendar starts the day the cabinet order is placed, not the day of demolition.
Do I need a City of Toronto permit for a kitchen renovation?
Yes, once anything moves. Relocating the sink, dishwasher, range, or electrical outlets triggers a building permit through Toronto Building, and removing a load-bearing wall also requires stamped engineer drawings. A straight cabinet-and-counter swap in the same positions does not. Plan exam for kitchen scope currently runs about 3–5 weeks — we submit and respond to comments on your behalf.
Can you move the sink in a Toronto condo kitchen?
Usually not. Condo drains tie into a vertical stack cast into the slab, and coring concrete to run new drainage is either prohibited by the declaration or requires structural engineering the board will not approve. The dishwasher can sometimes shift a metre or two if it stays on the same wet wall. We confirm what is actually possible against your unit drawings before quoting, rather than after demolition.
Which Toronto neighbourhoods do you work in?
We have renovated across the city — Midtown, Downtown, The Beaches, High Park, Roncesvalles, Leslieville, North York, Willowdale, Etobicoke, Royal York, Scarborough, and East York. Our crew comes in from Mississauga, typically 25–45 minutes depending on the hour.
What surprises come up in older Toronto kitchens?
Three, in order of how often we see them: knob-and-tube or aluminum wiring that has to be replaced before new circuits are legal; floors out of level by 20–40mm across the room, which needs a self-levelling underlayment before cabinets go in; and cast-iron drain stacks that are too corroded to reuse when the sink moves. We open a wall section during the estimate where we can, so these land in the quote rather than as a change order.

Let’s talk

Contact Osoba Renos & Design

Planning a kitchen renovation in Toronto? Book a free in-home estimate and we will confirm what your building and layout actually allow.

By submitting, you agree we may contact you about your renovation. We never share your info.