Kitchen Renovation Service

Kitchen Renovationin Toronto & GTA

Custom cabinetry, quartz counters, and a layout that finally works

  • 3–5 week timelines
  • 5-yr warranty
  • Free estimate
See projects

Where the money and the time go

Kitchens are a cabinetry and sequencing problem

Cabinetry and counters are usually 55–65% of a kitchen budget, and both are lead-time items — which is why the schedule lives or dies on when the order is placed, not on how fast the crew demolishes. We order cabinets first, template counters only after the boxes are set and levelled, and keep the plumber and electrician booked around those two dates. See what a kitchen renovation costs in 2026, or read how our renovation process works. Opening the kitchen into the dining room? Start with open-concept vs traditional layout.

Kitchen renovation cost & timeline (2026)

Four scope tiers we quote most often across Toronto and the GTA. Projects above $50,000 are typically beyond our usual scope.

Scope tierCost rangeTimelineTypical inclusions
Cabinet & counter refresh$18,000–$28,0002–3 weeksNew cabinetry in the existing footprint, quartz counters, backsplash, sink and faucet, under-cabinet lighting, paint. Nothing moves, so no permit.
Full rebuild, same footprint$25,000–$40,0003–4 weeksStrip to studs, new cabinetry and counters, tile or slab backsplash, flooring, pot lights, dedicated circuits, ducted range hood, appliance install.
Full rebuild + layout change$35,000–$50,0004–5 weeksEverything above plus an island added or moved and the sink or dishwasher relocated — new plumbing rough-in, electrical, permit, and inspections.
Add open-concept wall removal+$15,000–$35,000+1–3 weeksLoad-bearing wall opened with an engineered LVL or steel beam, stamped engineer drawings, permit, and floor patching across the new opening.

Ranges reflect our own 2026 quotes across Toronto, Mississauga, Etobicoke, Oakville, and North York. Your number depends on cabinet construction, slab choice, and whether anything moves. We measure on site and quote a fixed price before work starts. Full breakdown: kitchen renovation cost.

Make the Right Choice

Why homeowners chooseOsoba Renos

Home Remodeling Contractor in Toronto & GTA — clear pricing, in-house trades, and a guaranteed timeline.

Clear Pricing

Full transparency. After your free estimate we share a detailed proposal based on precise measurements — no hidden costs, no last-minute surprises.

5-Year Warranty

Our quality commitment, in writing. For up to 5 years after we deliver your project, our workmanship is covered — no exceptions.

In-House Trades

An experienced full-time crew — not a rotating cast of subs. Same faces, consistent quality, and a stress-free site from day one.

Dedicated Project Manager

One point of contact who runs the whole project on your behalf and resolves anything that comes up — quickly, without you chasing.

Guaranteed Timeline

A structured schedule with clear milestones, planned around every phase — so your project finishes on the date we set together.

What's included

Kitchen Renovation Scope

  • Custom Cabinetry

    Cabinets built to your layout — full-height uppers, deep drawers, pull-outs, and soft-close hardware throughout.

  • Quartz & Porcelain Countertops

    Templated and installed by our fabricator, with undermount sink cut-outs and waterfall or mitred edges.

  • Islands & Breakfast Bars

    Islands with seating, hidden storage, and — where the plumbing allows — a relocated sink or prep zone.

  • Tile & Slab Backsplashes

    Full-height slab, large-format porcelain, or classic tile, cut around outlets and under-cabinet lighting.

  • Electrical & Lighting Updates

    Pot lights, under-cabinet strips, pendants over the island, and the dedicated circuits code now requires.

  • Plumbing Relocations

    Moving the sink or dishwasher when the layout calls for it, with permits pulled and rough-ins inspected.

  • Appliance Integration

    Panelled fridge and dishwasher fronts, built-in wall ovens, and proper make-up air for high-CFM hoods.

  • Range Hoods & Ventilation

    Ducted hoods vented to the exterior — not recirculating — sized to the range beneath them.

  • Flooring

    Engineered hardwood, large-format porcelain, or luxury vinyl plank, levelled and transitioned to adjacent rooms.

  • Open-Concept Wall Removal

    Load-bearing walls opened with an engineered LVL or steel beam, drawings stamped and permitted.

  • Pantry & Storage Millwork

    Walk-in or cabinet pantries, coffee stations, and banquette seating built into the cabinetry run.

  • Paint & Finishing

    Trim, crown, baseboards, and a full paint finish so the kitchen reads as part of the rest of the floor.

People also ask

Kitchen renovation questions - Toronto and GTA

How much does a kitchen renovation cost in Toronto and GTA?
Kitchen renovations typically run $25,000–$50,000. A cabinet-and-counter refresh in the existing footprint starts around $18,000; a full rebuild with a relocated sink and a new island lands at the top of the range. Cabinetry is usually 40-50% of the total, which is why the box construction matters more than the door style - plywood carcasses with soft-close hardware outlast particleboard by a decade and the price gap is smaller than most people expect. Moving the sink is the single most expensive change you can make to a layout, because it means opening the floor for drain and vent. Projects above $50,000 are typically beyond our usual scope.
How long does a kitchen renovation take?
Most kitchens are finished in three to five weeks on site. Cabinetry is the long lead - custom orders run 4-8 weeks from the day you sign off on the drawings, so we order early and demolish only once the boxes have a confirmed delivery date. That way your kitchen is not sitting gutted while you wait on a factory. Build in a buffer for the two items that slip most often: appliance backorders, which is why we confirm your actual model numbers before the cabinet drawings are finalised, and counter fabrication, which cannot begin until the cabinets are installed and levelled.
Do I need a permit for a kitchen renovation?
A like-for-like cabinet and counter replacement does not need a permit. The moment the sink, dishwasher, range or electrical outlets move, you need one, and if a wall is coming out you also need stamped engineer drawings. The wall between a kitchen and living room is the one that catches people: it reads as cosmetic and is load-bearing more often than not in Toronto’s post-war housing stock. Two related things worth knowing - a modern kitchen needs dedicated circuits for the fridge, dishwasher, microwave and range, which frequently means a panel upgrade in older homes, and the range hood has to vent outside rather than recirculate if you are doing the work properly. We pull the permits and handle plan-exam comments and inspections.
Can I use my kitchen while it is being renovated?
No. The kitchen is out of service from demolition until the counters are templated and installed, which is usually the last two weeks of the schedule. Plan for three to five weeks of no kitchen and set up properly rather than improvising - fridge, microwave, kettle and a folding table in the dining room or basement, plus a plan for washing up, because the laundry tub becomes your sink. We leave the old fridge on a working circuit until the new one arrives, and we can stage the plumbing so a basement or laundry sink stays live throughout. Clients who set this up on day one cope fine. The ones who wing it are ordering takeout by week two.
Why is countertop installation always the last step?
Because a template taken off drawings will not match the cabinets as installed. Quartz and porcelain slabs are measured after the boxes are set and levelled, when the fabricator can capture the walls as they actually are - and no wall in a Toronto house built before 1980 is straight. Fabrication then takes 7-10 days. Everything downstream waits on that slab: the sink drops into it, the faucet mounts through it, and the backsplash tile sits on it. So the final week of a kitchen is counter delivery, plumbing hook-up and tile, in that order. It is also why a counter mistake is the most expensive one on the job, since a mis-cut slab means starting the 7-10 day clock again.
Do you supply the cabinets and appliances or do I?
Cabinetry, counters, backsplash tile, sink, faucet and lighting come through us. That is deliberate: when a door arrives damaged or a slab has a flaw, one party is responsible for fixing it and there is no argument about who owns the problem. Appliances are the exception - buy them yourself. Retailer sales and extended warranties beat anything we can pass through, and you keep the relationship with the retailer if a unit fails in year two. What we need from you is the actual model numbers before the cabinet drawings are finalised, because a 30-inch range and a 36-inch range are a different kitchen, and a counter-depth fridge that turns out not to be counter-depth is the sort of thing discovered on install day.

Kitchen renovation by area

Kitchen renovations across Toronto & GTA

Our crew works out of Mississauga and is on site daily across the GTA. Find your city below.

Let’s talk

Contact Osoba Renos & Design

Planning a kitchen renovation? Book a free in-home estimate and we will measure, price, and sequence it with you.

By submitting, you agree we may contact you about your renovation. We never share your info.