Home Addition Service

Home Additions in Toronto

Second storeys · Rear additions · Leaside · The Danforth · High Park · Midtown

  • Zoning checked before drawings
  • Toronto Building permits
  • 5-yr workmanship warranty
See projects

On a Toronto lot, the addition usually goes up or back

Most houses in the old city sit on narrow lots, often 18 to 30 feet wide, with little or no side yard to build into. That leaves two directions. A second storey on a bungalow, which is common in East York and the inner suburbs, or a rear addition that pushes the kitchen and family room into the backyard, which is the usual move on semis and detached houses across the east and west ends. Both run through Toronto Building zoning review against the city-wide by-law, and anything that does not comply goes to the Committee of Adjustment for a minor variance. We check height, setbacks, lot coverage and floor area at the site visit, before anyone pays for drawings.

Check the home additions guide and how our renovation process works before you call.

24 projects on this site were completed in Toronto; 6 of them are below. See all Toronto projects.

What decides the cost of a home addition in Toronto

Two additions with the same square footage can be priced very differently. We quote after the site visit, and the number firms up once the drawings and engineering exist.

  • Which type of addition it is. Going up means opening the roof, and going back means new foundations.
  • How much the existing house needs: reinforcing walls and footings, or bringing the electrical and HVAC up to carry more space
  • Whether the new space has a kitchen or bathroom, which adds plumbing and the most expensive finishes
  • Site access on a narrow lot, and whether a crane or a bin permit is needed
  • Soft costs before construction starts: drawings, engineering, survey and permit fees, plus any conservation authority or heritage review
  • Whether you renovate the existing floors at the same time, which is often cheaper than doing it later

Toronto areas and the additions we see there

  • Home Addition in East York & Leaside

    Post-war bungalows and 1930s brick houses on modest lots. A full second storey on a bungalow is the classic East York addition, and the existing foundations and walls get checked by an engineer before the design starts.

  • Home Addition in The Danforth & Riverdale

    Semis and narrow detached houses. Rear additions for a larger kitchen are the usual scope, and the shared wall with the neighbour means party-wall details and early conversations next door.

  • Home Addition in High Park, The Junction & Bloor West

    Older houses on deeper lots, some near ravines. A lot that backs onto a ravine can fall under the City ravine by-law and TRCA regulation, which adds a review before the permit.

  • Home Addition in Midtown & Davisville

    Detached houses where owners add a rear family room or a third-floor dormer instead of moving. Mature trees are common, so an arborist report is often part of the permit package.

A typical Toronto addition: a rear kitchen addition on a semi

The back wall of the house comes off, new foundations go in for a one- or two-storey addition, and the kitchen moves into the new space with a family room or a bigger bedroom above. The permit package usually needs a survey, structural drawings and, if a protected tree is near the dig, an arborist report. On a semi, the party wall and the neighbour's side get attention early. The old part of the house stays closed off until the final tie-in, so many families stay home through most of the build.

People also ask

Home Addition questions - Toronto

How much does a home addition cost in Toronto?
It depends on whether you build up or out, how much the existing house needs to carry the new space, and what goes inside it. A bedroom costs far less than a kitchen or a bathroom. Drawings, engineering, surveys and Toronto Building permit fees come before construction. We do not quote additions over the phone. You get a number after the site visit, and it becomes firm once the drawings and engineering exist.
How long does a home addition take in Toronto?
The paperwork comes first. Drawings, engineering and Toronto Building permit review often take several months before construction starts, and longer if the design needs a Committee of Adjustment variance or a conservation or heritage review. Construction time depends on the size and type of the addition, and the schedule comes with the quote.
Do I need a permit for a home addition in Toronto?
Yes, always. An addition needs a building permit from Toronto Building, and the drawings are checked against the zoning by-law for height, setbacks, lot coverage and floor area. A design that does not comply needs a minor variance from the Committee of Adjustment first. We coordinate the drawings, engineering and permit application, and book every inspection.
Can I add a second unit as part of a Toronto addition?
Often, yes. Toronto now permits more than one unit on most residential lots, so some owners plan the addition as a separate suite rather than more family space. A second unit adds fire separation, separate egress and its own services to the design, so it needs to be decided before the drawings start, not after.
Do you also build additions in Etobicoke, North York and Scarborough?
Yes. They are part of the City of Toronto and use the same zoning by-law and permit office, but the housing stock and lots differ enough that each has its own page. See the links at the bottom of this page.