Home Additions

Home Additions in Toronto & the GTA

Second storey · Rear additions · Over-garage · Dormers

  • Free in-home estimate
  • Zoning checked first
  • Drawings to final inspection
See projects

More room without moving out of the neighbourhood

A home addition adds floor area to the house you already own, by building up or out. In Toronto that usually means a second storey on a bungalow or a rear addition for a bigger kitchen and family room. Sometimes it is a room over the garage or a dormer.

Additions are structural work. They need drawings, an engineer, zoning review and a building permit before construction starts. We start with what your lot allows, so the design fits the by-law from the first draft.

Types of home additions we build

  • Second storey addition

    A full second floor on a bungalow or a storey-and-a-half. It adds the most space without using any yard, but the existing walls and footings have to carry the new load, so an engineer checks them before anything is designed. The family usually moves out while the roof is off.

  • Rear addition

    One or two storeys built off the back of the house, most often to get a larger kitchen and family room on the main floor. It needs new foundations and uses part of the yard, and rear-yard setbacks and lot coverage decide how deep it can go.

  • Side addition

    Possible on wider lots and corner lots where the side-yard setback leaves room. On many Toronto lots it does not, which is why rear and upward additions are more common here.

  • Addition over a garage

    A bedroom or suite built on top of an attached garage. The garage walls and slab were not built for a second floor, so they are checked and often reinforced, and the floor between the car and the bedroom needs fire separation and insulation.

  • Dormer

    The smallest addition: raising part of the roof to get standing room and a bathroom upstairs. It still changes the outside of the house, so it goes through zoning review like the larger options.

How a home addition runs

  1. 1. Site visit and feasibility

    We look at the house, the lot and what you want to add, then check what zoning is likely to allow: height, setbacks, lot coverage and floor area. If the idea will not fit the by-law, you hear it before anyone pays for drawings.

  2. 2. Drawings and engineering

    An addition needs permit drawings from a qualified designer or architect, and a structural engineer to size the foundations, beams and any reinforcement of the existing house. Some projects also need a survey or an arborist report if a protected tree is near the work.

  3. 3. Zoning review and building permit

    The drawings go through zoning review and then the building permit. If the design needs a minor variance, it goes to the Committee of Adjustment first, which adds months and has no guaranteed outcome. Our Toronto renovation permits guide covers the City process in more detail.

  4. 4. Build and inspections

    Foundations or structural reinforcement, framing, roof and windows to get the shell closed in, then plumbing, electrical and HVAC, insulation, drywall and finishes. City inspectors sign off at each stage, and the last step is tying the new space into the old house so it looks like it was always there.

What drives the cost of an addition

Two additions with the same square footage can be priced very differently. These six things move the number most:

  • Which type of addition it is. Going up means opening the roof, and going back means new foundations.
  • How much the existing house needs: reinforcing walls and footings, or bringing the electrical and HVAC up to carry more space
  • Whether the new space has a kitchen or bathroom, which adds plumbing and the most expensive finishes
  • Site access on a narrow lot, and whether a crane or a bin permit is needed
  • Soft costs before construction starts: drawings, engineering, survey and permit fees, plus any conservation authority or heritage review
  • Whether you renovate the existing floors at the same time, which is often cheaper than doing it later

Renovating the rest of the house at the same time? See full home renovation costs.

When you may not need an addition

Sometimes the space is already there. An unfinished basement, a closed-off main floor or an under-used garage can often give you the room you need for less money and without a Committee of Adjustment hearing. We will tell you at the site visit if a basement renovation or a full home renovation gets you there first.

We have not published a home addition project on this site yet. See our Toronto projects.

People also ask

Home addition questions - Toronto

Do I need a permit for a home addition?
Yes. Any addition needs a building permit from your city or town, and the drawings also go through zoning review for height, setbacks, lot coverage and floor area. If the design needs a minor variance, it goes to the Committee of Adjustment before the permit can be issued.
How much does a home addition cost?
It depends on whether you build up or out, how much the existing structure needs, and what goes inside. A bedroom costs far less than a kitchen or a bathroom. We do not quote additions from a phone call. You get a number after the site visit, and it becomes firm once drawings and engineering exist.
Is it better to build up or build out?
Building up keeps the yard, and it is often the only option on narrow Toronto lots, but the existing walls and foundations have to carry a new floor. Building out leaves most of the house untouched during construction, but it uses yard space and needs new foundations. Zoning on your lot usually narrows the choice before cost does.
How long does a home addition take?
The paperwork comes first. Drawings, engineering and the permit often take several months before construction starts, and longer if a Committee of Adjustment hearing is needed. Construction time depends on the size and type of addition, and we give you a schedule with the quote.
Can we live in the house during a second storey addition?
Usually not. While the roof is open and the structure is being tied in, the house is exposed to weather and has no working upper floor. For a rear addition, many families stay through most of the build because the old house stays closed until the final tie-in.
Do you handle the drawings and permit?
We coordinate the drawings, structural engineering and permit application with the designer or architect, so you have one point of contact from the first visit to the final inspection. If you already have stamped drawings, we can build from those.
Which cities do you build additions in?
Toronto, including Etobicoke, North York and Scarborough, plus Mississauga, Brampton, Oakville, Burlington, Vaughan, Richmond Hill and Markham. Each municipality has its own zoning by-law, Committee of Adjustment and permit office, and some lots also need conservation authority or heritage review. Each city page covers what is different there.

Let’s talk

Contact Osoba Renos & Design

Planning a home addition in Toronto or the GTA? Book a free in-home estimate and we will start with what your lot allows.

By submitting, you agree we may contact you about your renovation. We never share your info.