Bathroom renovation · Toronto

Bathroom Remodel with Black Fixtures and Mosaics

Contemporary bathroom renovation glass showerAfterToronto, Ontario · Completed 2022See all 4 photos
Call 647-562-4275
  • Free in-home consultation
  • Fixed-price proposal
  • 5-year workmanship warranty
  • In-house crew30+ years
  • 5-year warrantyWorkmanship
  • WSIB$2M liability
  • One project managerStart to finish

Like this bathroom?

Tell us about your bathroom and we will price this level of build for your space, in writing, before anything is demolished.

Call 647-562-4275
  • Free in-home consultation
  • Fixed-price proposal
  • 5-year workmanship warranty

The facts

Project at a glance

Project
Bathroom Remodel with Black Fixtures and Mosaics
Location
Toronto
Type
Bathroom remodel with matte black accents
Completed
2022
Budget
$12,000–$22,000
Published range for this scope tier, not this project’s contract price
Timeline
1–2 weeks on site
Published range for this scope tier
Crew
In-house, no subcontractor rotation
Warranty
5-year workmanship

The case study

How this bathroom came together

  1. A bold bathroom remodel in black fixtures and mosaic tile

    This bathroom remodel with black fixtures took a dated tile-and-chrome bathroom and rebuilt it around a clear modern design idea: light walls, hexagonal floor tiles for texture, and bold black fixtures as the accent that ties everything together. The owners wanted a contemporary aesthetic without sacrificing the practical storage and openness they used every day, so the renovation balances visual impact with everyday function.

  2. The work

    We started by stripping out the original tile, fixtures, and vanity, then prepped the walls and floor for new tile installations. The wall tile was kept light to keep the room feeling bright and spacious, while hexagonal floor tile in a darker tone adds texture and visual interest underfoot — a subtle pattern shift that grounds the room without competing with the wall surfaces. Matte black faucets, shower hardware, and door fittings were chosen as the accent, contrasting against the light surfaces and pulling all the fixtures into the same visual family.

  3. The result

    A spacious vanity provides everyday storage and balances the room visually, while a glass shower door keeps the space feeling open and lets the shower tile remain part of the overall view. The combination of light walls, patterned floor, black accents, and clear glass produces a bathroom that feels both luxurious and inviting — modern enough to read as a planned design, practical enough to use without thinking about it.

Scope

What we built

  • Strip and demolition
  • Wall and floor tile install
  • Spacious vanity install
  • Glass shower door install
  • Fixture replacement
  • Hexagonal floor tile (darker tone)
  • Light wall tile
  • Matte black faucets and shower hardware
  • Frameless glass shower door
  • Storage vanity

Budget

What a bathroom like this costs

This project

Bathroom rebuild

$12,000–$22,000

1–2 weeks on site

Strip to studs, waterproofing, tile, vanity, fixtures, glass, lighting — without moving the layout.

Spa-style rebuild with layout change

$22,000–$32,000+

1–2 weeks on site

Layout reconfiguration, large-format porcelain, freestanding tub, double vanity, premium fixtures.

What moves the number

  • Whether the layout and plumbing move, or stay where they are
  • Tile format and material: large-format porcelain and mosaic cost more to set
  • Fixture level: smart toilet, LED mirrors, heated towel rack, rainfall plus handheld
  • Custom millwork: a vanity with built-in storage is cabinetry, not a stock unit

We measure on site and give you a fixed-price proposal before work starts. If your budget and the scope you want do not line up, we will tell you that at the estimate rather than after.

Timeline

How long your bathroom is out of service

A bathroom runs 1–2 weeks on site, whether it is a rebuild in the existing footprint or a layout change. In a condo, add 2–4 weeks up front for the alteration agreement and elevator booking — that happens before demolition, so it does not extend the time your bathroom is unusable.

Timelines are the schedule we commit to at proposal, with milestones you can hold us to.

Want this priced for your bathroom?

We measure on site, then put the scope, the schedule and the fixed price in writing before anything is demolished.

Call 647-562-4275
  • Free in-home consultation
  • Fixed-price proposal
  • 5-year workmanship warranty

Why Osoba

Why homeowners hire Osoba for work like this

No surprise pricing
You get a detailed fixed-price proposal built from on-site measurements before construction starts, not an hourly estimate that drifts.
One team, not a rotating cast
Our in-house crew does the work. The same faces are in your home from the first day to final detailing, which is why the finishing holds up.
One person responsible
A dedicated project manager runs the job end to end and resolves anything that comes up, so you are not chasing trades.
Peace of mind after we leave
A 5-year workmanship warranty in writing, plus WSIB coverage and $2M general liability insurance.

Social proof

What homeowners say

I would highly recommend Osoba Reno’s. we’ve hired them twice in the last few years. Once was to do flooring, and we liked how earnest and professional they were, that we invited them back to do three bathrooms, a stylish slat wall wall and potlights in the living room. They communicated well, adapted to our needs over the course of the project, and were reasonably priced. But what really stood out to us was how committed the team was to delivering a stellar end result. They genuinely cared about the quality of their work, and how we were going to live in these spaces after they were gone. We’re big Osoba fans and will definitely call again.
DBDavid BrandsGoogle review · three bathroomsRead all reviews ↗

Questions answered

Bathroom renovation questions

How much does a bathroom renovation cost in the GTA?
Bathroom renovations typically run $12,000–$22,000 for a full rebuild in the existing footprint, and $22,000–$32,000+ for a spa-style build that moves the layout. Final pricing depends on plumbing changes, tile format, fixture level and custom millwork.
How long will my bathroom be unusable?
Plan on 1–2 weeks on site. Condo approvals add 2–4 weeks before demolition rather than extending the outage.
Do you use your own crew or subcontractors?
Our in-house crew does the work, with a dedicated project manager coordinating the project from start to finish. That is what keeps the finishing consistent across a whole job.
What warranty and insurance do you carry?
A 5-year workmanship warranty in writing, active WSIB clearance and $2M general liability insurance. We provide the certificates condo boards and property managers ask for.

Let’s talk

Get your free bathroom quote

Tell us about your bathroom and our project manager Igor will reach out to book a free in-home consultation.

By submitting, you agree we may contact you about your renovation. We never share your info.