Condo Bathroom Renovation in Toronto & GTA
Condo bathroom renovations across Toronto, Mississauga, Etobicoke, and the wider GTA. Board-approved scope, soundproofing, waterproof membrane systems, walk-in showers, custom tilework, and designer vanities — built by a full-time in-house crew with a 5-year warranty.
What's included
What a condo bathroom renovation covers
Walk-In Showers
Spacious, modern showers built with premium tilework, waterproofing, and designer fixtures.
Curbless / Barrier-Free Showers
Seamless low-threshold shower designs that create an open, elegant, and accessible feel.
Premium Tilework & Waterproofing
Expert tile installation with reliable waterproofing systems for long-lasting beauty and durability.
Custom & Double Vanities
Stylish vanity solutions with quality cabinetry, countertops, hardware, and storage.
Freestanding Bathtubs
Elegant statement tubs installed to create a relaxing, spa-inspired bathroom centerpiece.
Heated Floors
Comfortable in-floor heating systems that add warmth, luxury, and everyday comfort.
Niches & Benches
Built-in shower niches and benches designed for convenience, storage, and refined functionality.
Glass Shower Enclosures
Clean, modern glass panels and doors that complete the shower with an open, high-end look.
LED Mirrors & Luxury Lighting
Backlit mirrors, pot lights, sconces, and accent lighting that elevate the entire space.
Quiet Exhaust Fans & Ventilation
Low-noise ventilation systems that help control moisture and keep the bathroom fresh.
Plumbing Fixture Upgrades
Premium faucets, shower systems, rainfall heads, tub fillers, and toilets installed with care.
Feature Walls
Designer tile, microcement, or textured accent walls that create a bold bathroom focal point.
Storage Solutions
Smart built-in shelving, recessed storage, medicine cabinets, and vanity storage options.
High-End Finishing Details
Clean tile edges, silicone lines, hardware, accessories, and final details for a polished result.
For smaller footprints, read our guide: Small Condo Bathroom Renovation Ideas for Toronto.
Condo bathroom renovation cost in Toronto (2026)
Three pricing tiers we see most often in Toronto and GTA condos. Final cost depends on building rules, finish level, and whether plumbing relocates.
| Scope tier | Cost range | Timeline | What’s included |
|---|---|---|---|
| Compact refresh | $11,000–$16,000 | ~3 weeks | Like-for-like fixture swap, new floor and shower tile in the existing layout, new vanity, paint, board paperwork. |
| Standard rebuild | $16,000–$22,000 | ~4 weeks | Strip to studs, Schluter-Kerdi waterproofing, walk-in or tub-shower swap, custom vanity, LED mirror, brand-name fixture upgrade. |
| Spa-style ensuite | $22,000–$32,000+ | 5–6 weeks | Layout tweak, large-format porcelain, niche + bench, frameless glass, heated floor, premium fixtures, designer lighting. |
Condo bathrooms in Toronto run 15–25% above the same scope in a freehold home — building access fees, soundproofing, and restricted hours account for the gap.
How a Toronto condo bathroom approval actually works
Five steps between “we want a new bathroom” and demo day. We run all of them so the owner does not become the project manager.
- 1
Scope, measure, drawings
We measure on-site, draft a layout, and confirm what your board allows — drain stays vs. moves, supply re-routes, vent paths. Outputs: itemised quote and one-page drawing for the board.
- 2
Insurance package issued
$2M general liability certificate and WSIB clearance issued naming your corporation as additional insured. Boards typically need 1–2 weeks to confirm. We send these direct to property management.
- 3
Schedule "X" / alteration agreement
Almost every Toronto condo requires a signed alteration agreement before work begins. We prepare the full submission — scope, drawings, insurance, WSIB, worker list — so property management can preview before the board meeting.
- 4
Elevator + loading-dock booking
We coordinate freight elevator slots, loading-dock windows, and contractor parking direct with property management. In downtown towers, freight is often booked 3–4 weeks ahead — start early.
- 5
Quiet hours + neighbour notice
Work scheduled inside the building's permitted hours (typically 9am–5pm weekdays). The week before demo, we hand out written notice to the suite above, below, and either side so noisy days are not a surprise.
Where the four weeks actually go
A 4-week condo bathroom is not 4 weeks of swinging hammers. Roughly: two days of demo and protection, three to four days of waterproofing and prep, five to six days of tilework (the longest line item by far), one day for the vanity and toilet, two to three days for fixtures, glass, mirror, and lighting, plus one to two days of paint touch-up and final clean.
What turns a four-week schedule into five or six is rarely the work — it is freight elevator availability, a neighbour quiet-hour complaint, or a board change to the alteration agreement. We schedule around all three from the start, and your weekly progress update spells out where every day went.
Make the Right Choice
Why homeowners chooseOsoba RenosOsoba Renos & Design
№1 Home Remodeling Contractor in Toronto & GTA — clear pricing, in-house trades, and a guaranteed timeline.
Questions answered
Condo Bathroom Renovation — FAQ
How much does a condo bathroom renovation cost in Toronto in 2026?
How long does a condo bathroom renovation take?
Do I need condo board approval to renovate my bathroom?
Can I move the bathroom plumbing in a condo?
What about small condo bathrooms?
What IIC rating does my bathroom flooring need?
Can I move the toilet drain in my condo?
How loud and disruptive is the demo day?
Renovating your condo bathroom?
Send us your building address and unit details — we will confirm experience in your building and pricing.