Condo Bathroom Renovation in Toronto & GTA

Condo bathroom renovations across Toronto, Mississauga, Etobicoke, and the wider GTA. Board-approved scope, soundproofing, waterproof membrane systems, walk-in showers, custom tilework, and designer vanities — built by a full-time in-house crew with a 5-year warranty.

or call 647-562-4275

What's included

What a condo bathroom renovation covers

  • Walk-In Showers

    Spacious, modern showers built with premium tilework, waterproofing, and designer fixtures.

  • Curbless / Barrier-Free Showers

    Seamless low-threshold shower designs that create an open, elegant, and accessible feel.

  • Premium Tilework & Waterproofing

    Expert tile installation with reliable waterproofing systems for long-lasting beauty and durability.

  • Custom & Double Vanities

    Stylish vanity solutions with quality cabinetry, countertops, hardware, and storage.

  • Freestanding Bathtubs

    Elegant statement tubs installed to create a relaxing, spa-inspired bathroom centerpiece.

  • Heated Floors

    Comfortable in-floor heating systems that add warmth, luxury, and everyday comfort.

  • Niches & Benches

    Built-in shower niches and benches designed for convenience, storage, and refined functionality.

  • Glass Shower Enclosures

    Clean, modern glass panels and doors that complete the shower with an open, high-end look.

  • LED Mirrors & Luxury Lighting

    Backlit mirrors, pot lights, sconces, and accent lighting that elevate the entire space.

  • Quiet Exhaust Fans & Ventilation

    Low-noise ventilation systems that help control moisture and keep the bathroom fresh.

  • Plumbing Fixture Upgrades

    Premium faucets, shower systems, rainfall heads, tub fillers, and toilets installed with care.

  • Feature Walls

    Designer tile, microcement, or textured accent walls that create a bold bathroom focal point.

  • Storage Solutions

    Smart built-in shelving, recessed storage, medicine cabinets, and vanity storage options.

  • High-End Finishing Details

    Clean tile edges, silicone lines, hardware, accessories, and final details for a polished result.

For smaller footprints, read our guide: Small Condo Bathroom Renovation Ideas for Toronto.

Condo bathroom renovation cost in Toronto (2026)

Three pricing tiers we see most often in Toronto and GTA condos. Final cost depends on building rules, finish level, and whether plumbing relocates.

Scope tierCost rangeTimelineWhat’s included
Compact refresh$11,000–$16,000~3 weeksLike-for-like fixture swap, new floor and shower tile in the existing layout, new vanity, paint, board paperwork.
Standard rebuild$16,000–$22,000~4 weeksStrip to studs, Schluter-Kerdi waterproofing, walk-in or tub-shower swap, custom vanity, LED mirror, brand-name fixture upgrade.
Spa-style ensuite$22,000–$32,000+5–6 weeksLayout tweak, large-format porcelain, niche + bench, frameless glass, heated floor, premium fixtures, designer lighting.

Condo bathrooms in Toronto run 15–25% above the same scope in a freehold home — building access fees, soundproofing, and restricted hours account for the gap.

How a Toronto condo bathroom approval actually works

Five steps between “we want a new bathroom” and demo day. We run all of them so the owner does not become the project manager.

  1. 1

    Scope, measure, drawings

    We measure on-site, draft a layout, and confirm what your board allows — drain stays vs. moves, supply re-routes, vent paths. Outputs: itemised quote and one-page drawing for the board.

  2. 2

    Insurance package issued

    $2M general liability certificate and WSIB clearance issued naming your corporation as additional insured. Boards typically need 1–2 weeks to confirm. We send these direct to property management.

  3. 3

    Schedule "X" / alteration agreement

    Almost every Toronto condo requires a signed alteration agreement before work begins. We prepare the full submission — scope, drawings, insurance, WSIB, worker list — so property management can preview before the board meeting.

  4. 4

    Elevator + loading-dock booking

    We coordinate freight elevator slots, loading-dock windows, and contractor parking direct with property management. In downtown towers, freight is often booked 3–4 weeks ahead — start early.

  5. 5

    Quiet hours + neighbour notice

    Work scheduled inside the building's permitted hours (typically 9am–5pm weekdays). The week before demo, we hand out written notice to the suite above, below, and either side so noisy days are not a surprise.

Where the four weeks actually go

A 4-week condo bathroom is not 4 weeks of swinging hammers. Roughly: two days of demo and protection, three to four days of waterproofing and prep, five to six days of tilework (the longest line item by far), one day for the vanity and toilet, two to three days for fixtures, glass, mirror, and lighting, plus one to two days of paint touch-up and final clean.

What turns a four-week schedule into five or six is rarely the work — it is freight elevator availability, a neighbour quiet-hour complaint, or a board change to the alteration agreement. We schedule around all three from the start, and your weekly progress update spells out where every day went.

Make the Right Choice

Why homeowners chooseOsoba Renos

№1 Home Remodeling Contractor in Toronto & GTA — clear pricing, in-house trades, and a guaranteed timeline.

Clear Pricing

Full transparency. After your free estimate we share a detailed proposal based on precise measurements — no hidden costs, no last-minute surprises.

5-Year Warranty

Our quality commitment, in writing. For up to 5 years after we deliver your project, our workmanship is covered — no exceptions.

In-House Trades

An experienced full-time crew — not a rotating cast of subs. Same faces, consistent quality, and a stress-free site from day one.

Dedicated Project Manager

One point of contact who runs the whole project on your behalf and resolves anything that comes up — quickly, without you chasing.

Guaranteed Timeline

A structured schedule with clear milestones, planned around every phase — so your project finishes on the date we set together.

Questions answered

Condo Bathroom Renovation — FAQ

How much does a condo bathroom renovation cost in Toronto in 2026?
A condo bathroom renovation in Toronto typically costs $14,000–$25,000. Condo bathrooms run 15–25% higher than freehold bathrooms because of elevator booking fees, restricted work hours, soundproofing requirements, and limited access to the suite.
How long does a condo bathroom renovation take?
Three to five weeks for most Toronto and GTA condo bathrooms. Building rules — quiet hours, elevator availability, board approval timing — usually add 1–2 weeks compared to a freehold bathroom of the same scope.
Do I need condo board approval to renovate my bathroom?
Almost always yes. Even a like-for-like bathroom refresh usually requires a Schedule "X" alteration agreement. We prepare the renovation package — scope, drawings, contractor insurance, WSIB, worker list — and submit on your behalf.
Can I move the bathroom plumbing in a condo?
Sometimes. Drain relocation depends on slab access and building stack location — many Toronto condos do not allow it. Supply lines are more flexible. We confirm what is possible in your specific unit before quoting.
What about small condo bathrooms?
Small condo bathrooms are our specialty. Floating vanities, walk-in showers instead of tubs, large-format tile for visual flow, recessed niches, and layered lighting all help a tight footprint feel bigger.
What IIC rating does my bathroom flooring need?
IIC 50 is the minimum most Toronto condo declarations call for; some buildings (especially newer downtown towers) require IIC 55 or 60. We install board-compliant cork or rubber underlay (Acoustik, Proflex) under every hard-surface install and include the spec sheet in the alteration agreement.
Can I move the toilet drain in my condo?
Rarely. Toilet drains in most Toronto condos sit on the building's main stack and cannot be moved without engineering review, board approval, and often sign-off from the unit below. Sink and shower supply lines are more flexible. We confirm what is possible during the in-unit measure before quoting.
How loud and disruptive is the demo day?
Loud for 3–4 hours on day one when we strip tile and remove the tub — the rest is saws, drills, and hammers within the board's quiet-hour limits. The suite above, below, and either side get a written notice from us the week prior. Daily clean-up keeps the hallway and elevator presentable for the rest of the building.