Bathroom renovation · Oakville

Main Bathroom Renovation in Oakville

Oakville bathroom renovation full bathroom layoutAfterOakville, Ontario · Completed 2025See all 5 photos
Call 647-562-4275
  • Free in-home consultation
  • Fixed-price proposal
  • 5-year workmanship warranty
  • In-house crew30+ years
  • 5-year warrantyWorkmanship
  • WSIB$2M liability
  • One project managerStart to finish

Like this bathroom?

Tell us about your bathroom and we will price this level of build for your space, in writing, before anything is demolished.

Call 647-562-4275
  • Free in-home consultation
  • Fixed-price proposal
  • 5-year workmanship warranty

The facts

Project at a glance

Project
Main Bathroom Renovation in Oakville
Location
Oakville
Type
Main bathroom renovation (modern spa-style)
Completed
2025
Budget
$22,000–$32,000+
Published range for this scope tier, not this project’s contract price
Timeline
1–2 weeks on site
Published range for this scope tier
Crew
In-house, no subcontractor rotation
Warranty
5-year workmanship

The case study

How this bathroom came together

  1. Renovating the main bathroom in Oakville

    This Oakville main bathroom renovation rebuilt a tired family bathroom into a modern, spa-like space that complements the rest of the home's contemporary interior. The owners wanted a bathroom that read as deliberately designed rather than simply updated — clear material choices, coordinated hardware, and finishes that hold up to daily family use. The renovation balances refined finishes with practical functions that the bathroom is actually used for every day.

  2. The work

    The tub/shower area now features a black-framed fixed glass panel that defines the wet zone without enclosing the room, paired with a matte black rainfall and handheld fixture set for everyday flexibility. Japanese-inspired glossy marble-look porcelain tiles cover the wet wall with a custom recessed niche for toiletries — black-trimmed to match the surrounding hardware and pull the tile and fixtures into the same visual family. The contrasting glossy tile catches light and adds depth without competing with the rest of the room's finishes.

  3. The result

    A new grey vanity with a durable quartz countertop, matte black hardware, and a bright LED mirror provides the functional core of the bathroom. Updated lighting, refined floor tiles, and subtle luxury accents — black trim around the niche, coordinated fixtures throughout — elevate the room from a typical family bathroom into a quietly luxurious daily-use space. The finished bathroom feels intentional, calm, and built around real family routines.

Scope

What we built

  • Demolition
  • Waterproofing
  • Tile install (wet wall and floor)
  • Custom recessed niche install
  • Vanity install
  • Fixture install
  • Lighting install

Budget

What a bathroom like this costs

This project

Spa-style rebuild with layout change

$22,000–$32,000+

1–2 weeks on site

Layout reconfiguration, large-format porcelain, freestanding tub, double vanity, premium fixtures.

Bathroom rebuild

$12,000–$22,000

1–2 weeks on site

Strip to studs, waterproofing, tile, vanity, fixtures, glass, lighting — without moving the layout.

What moves the number

  • Whether the layout and plumbing move, or stay where they are
  • Tile format and material: large-format porcelain and mosaic cost more to set
  • Fixture level: smart toilet, LED mirrors, heated towel rack, rainfall plus handheld
  • Custom millwork: a vanity with built-in storage is cabinetry, not a stock unit

We measure on site and give you a fixed-price proposal before work starts. If your budget and the scope you want do not line up, we will tell you that at the estimate rather than after.

Timeline

How long your bathroom is out of service

A bathroom runs 1–2 weeks on site, whether it is a rebuild in the existing footprint or a layout change. In a condo, add 2–4 weeks up front for the alteration agreement and elevator booking — that happens before demolition, so it does not extend the time your bathroom is unusable.

Timelines are the schedule we commit to at proposal, with milestones you can hold us to.

Want this priced for your bathroom?

We measure on site, then put the scope, the schedule and the fixed price in writing before anything is demolished.

Call 647-562-4275
  • Free in-home consultation
  • Fixed-price proposal
  • 5-year workmanship warranty

Why Osoba

Why homeowners hire Osoba for work like this

No surprise pricing
You get a detailed fixed-price proposal built from on-site measurements before construction starts, not an hourly estimate that drifts.
One team, not a rotating cast
Our in-house crew does the work. The same faces are in your home from the first day to final detailing, which is why the finishing holds up.
One person responsible
A dedicated project manager runs the job end to end and resolves anything that comes up, so you are not chasing trades.
Peace of mind after we leave
A 5-year workmanship warranty in writing, plus WSIB coverage and $2M general liability insurance.

Social proof

What homeowners say

I would highly recommend Osoba Reno’s. we’ve hired them twice in the last few years. Once was to do flooring, and we liked how earnest and professional they were, that we invited them back to do three bathrooms, a stylish slat wall wall and potlights in the living room. They communicated well, adapted to our needs over the course of the project, and were reasonably priced. But what really stood out to us was how committed the team was to delivering a stellar end result. They genuinely cared about the quality of their work, and how we were going to live in these spaces after they were gone. We’re big Osoba fans and will definitely call again.
DBDavid BrandsGoogle review · three bathroomsRead all reviews ↗

Questions answered

Bathroom renovation questions

How much does a bathroom renovation cost in the GTA?
Bathroom renovations typically run $12,000–$22,000 for a full rebuild in the existing footprint, and $22,000–$32,000+ for a spa-style build that moves the layout. Final pricing depends on plumbing changes, tile format, fixture level and custom millwork.
How long will my bathroom be unusable?
Plan on 1–2 weeks on site. Condo approvals add 2–4 weeks before demolition rather than extending the outage.
Do you use your own crew or subcontractors?
Our in-house crew does the work, with a dedicated project manager coordinating the project from start to finish. That is what keeps the finishing consistent across a whole job.
What warranty and insurance do you carry?
A 5-year workmanship warranty in writing, active WSIB clearance and $2M general liability insurance. We provide the certificates condo boards and property managers ask for.

Let’s talk

Get your free bathroom quote

Tell us about your bathroom and our project manager Igor will reach out to book a free in-home consultation.

By submitting, you agree we may contact you about your renovation. We never share your info.