Renovation Contractor in Meadowvale

Osoba Renos & Design is a licensed renovation contractor serving Meadowvale and Meadowvale Village, Mississauga. Full home, bathroom, basement, and kitchen renovations — headquartered nearby in Mississauga with a full-time in-house crew and a 5-year workmanship warranty.

or call 647-562-4275

What we build in Meadowvale

Full Home Renovation in Meadowvale

Whole-home rebuilds for Meadowvale detached homes, semi-detached, and townhouses.

See details →

Bathroom Renovation

Walk-in showers, custom tilework, designer vanities, and freestanding tubs.

See details →

Basement Renovation

Finished basements and basement apartments for Meadowvale and Meadowvale Village.

See details →

Kitchen Remodel

Custom cabinetry, quartz counters, tile backsplashes, and updated layouts.

See details →

Meadowvale renovation cost & timeline by service (2026)

Meadowvale pricing tracks the wider Mississauga market. Most 1970s–1990s homes are at the full-replacement age for kitchens and bathrooms.

ServiceCost rangeTimelineMeadowvale notes
Bathroom renovation$12,000–$22,0002–4 weeksCommon scope in 1970s–1990s Meadowvale detached and semi-detached homes.
Kitchen remodel$25,000–$50,0004–6 weeksBuilder-grade Meadowvale kitchens often need full cabinet replacement at the 20–30 year mark.
Basement finishing$100–$150/sq. ft.3–4 weeksMany Meadowvale lots support legal ARU under Ontario's framework.
Whole-home renovation$80–$150/sq. ft.6–12 weeksMost Meadowvale homes from 1975–1995 — typically need finish updates rather than system rebuilds.

Meadowvale areas we work in

Each pocket of Meadowvale has its own housing age and typical scope. Here is the practical breakdown.

  • Renovation contractor in Meadowvale (original community)

    The 1970s planned community south of Britannia Road, west of Mississauga Road. Detached, semi-detached, and townhouse mix with mature trees. Builder-grade kitchens and bathrooms from the original build are now at full-replacement age.

  • Renovation contractor in Meadowvale Village

    Older, more rural-style detached homes north of Derry Road. Larger lots and original 1980s–1990s housing stock. Whole-home renovations and major kitchen + bath combos are typical scope.

  • Renovation contractor in Lisgar

    South of Meadowvale, mostly 1990s–2000s detached and semi-detached. Newer plumbing and electrical means fewer surprises during renovation — finish-level upgrades dominate the scope.

  • Renovation contractor in Western Business Park area

    Townhouse and condo townhouse complexes along Tenth Line and Aquitaine. Compact renovations focused on kitchens, bathrooms, and basements; layout changes constrained by townhouse demising walls.

Make the Right Choice

Why homeowners chooseOsoba Renos

№1 Home Remodeling Contractor in Toronto & GTA — clear pricing, in-house trades, and a guaranteed timeline.

Clear Pricing

Full transparency. After your free estimate we share a detailed proposal based on precise measurements — no hidden costs, no last-minute surprises.

5-Year Warranty

Our quality commitment, in writing. For up to 5 years after we deliver your project, our workmanship is covered — no exceptions.

In-House Trades

An experienced full-time crew — not a rotating cast of subs. Same faces, consistent quality, and a stress-free site from day one.

Dedicated Project Manager

One point of contact who runs the whole project on your behalf and resolves anything that comes up — quickly, without you chasing.

Guaranteed Timeline

A structured schedule with clear milestones, planned around every phase — so your project finishes on the date we set together.

Questions answered

Renovation Contractor Meadowvale — FAQ

Do you serve Meadowvale?
Yes — Meadowvale and Meadowvale Village are both core service areas. We cover the postal-code areas L5N, L5W, and L5V, plus the housing stock around the Meadowvale Town Centre and the older estate-style homes in Meadowvale Village.
How long does a Meadowvale renovation take?
Bathroom renovations run 2–4 weeks. Basements run 3–4 weeks. Full-home renovations on Meadowvale properties run 6–12 weeks, depending on size and scope.
How much does a renovation cost in Meadowvale?
Meadowvale bathroom renovations typically run $12,000–$22,000. Kitchen renovations $25,000–$50,000. Basement renovations $100–$150/sq. ft. Full-home renovations $80–$150/sq. ft.
Are you nearby?
Yes — our Mississauga base is in the Lisgar/Meadowvale corridor, so we are minutes away. Inspections, estimates, and material runs stay efficient.
Can I add a basement apartment in Meadowvale?
Yes — most Meadowvale detached, semi-detached, and townhouse lots are eligible under Ontario's ARU framework, with City of Mississauga building permit and post-construction registration. Common build cost runs $48,000–$80,000 with separate entry, egress, fire separation, and dedicated kitchen.
My 1980s Meadowvale kitchen still works — do I need to replace it?
Not necessarily. If cabinetry is solid wood with intact boxes, refacing or repainting plus new doors, hardware, and counters runs $12,000–$22,000 — half the cost of full replacement. If boxes are particleboard with water damage or sagging shelves, full replacement is the better long-term call. We assess during the site visit and quote both options when refacing is realistic.
What is the typical lead time for a Meadowvale project start?
Spring and fall — 6–10 weeks from estimate to start. Winter — 3–6 weeks. We hold a scheduled start date in writing once the deposit lands; that buys you a confirmed slot rather than a moving target.

Ready to renovate in Meadowvale?

Free in-home estimate, itemised proposal, and 5-year warranty.

or call 647-562-4275